Skip to content
Accessibility
  • Text Size:
  • Normal
  • Large
  • Larger
  • Screen Colours:
  • Normal
  • Black & Yellow
Minsmere Levels
  • Home
  • Newsletters
  • Sizewell C
    Post Examination submissions Statement of Common Ground and Representations DCO Hearings Consultation Responses Additional Documents Discharge of Requirements
  • MLSG History
    Draining of Minsmere Levels MLSG Meeting Minutes Public Meetings
  • Gallery
    2018 Levels 2013 Tide Surge 2007/2008 Flooding Minsmere and Coast Maps
  • Subscribe To MLSG
  • Donate
  • Useful Links
  • News Posts

Statement of Common Ground and Representations

Sizewell C » Statement of Common Ground and Representations

Formal Documents
Statement of (Un)Common Ground (pdf)
Relevant Representation (pdf)
Deadline B Representation (pdf)
Written Representation (pdf)
Prelim. Meeting Summary (pdf)
Open Floor Hearing (pdf)

These documents are our initial representations to the PINS Examiners prior to the DCO examination proper along with our initial representations to PINS. The Statement of Common Ground wih EDF was created over the course of the examination at the request of the PINS Examining Authority. The first of these documents, the "Relevant Representation" is shown below.

Representation

MLSG is concerned that the Sizewell C (SZC) Development Consent Order Application (DCO) submitted by EDF remains significantly incomplete and fails to provide answers to questions raise consistently during four rounds of consultation. In short,

  • Assessment of coastal geomorphological impacts over time, the role of the Sizewell-Dunwich Bank and coastal breach
  • The platform is well below the expected 30 hectares per nuclear reactor envisaged in EN-6 and has required unacceptable compromises on long term site safety
  • The platform requires the Hard Coastal Defence Feature (HCDF) to be very close to the beach and subject to early exposure by wave action
  • There is no proposed design for the HCDF, yet EDF have unevidenced confidence about its likely exposure
  • EDF do not evidence an understanding of the relationship between ground and surface water despite being a Scoping Report Opinion requirement
  • The platform requires redirection of existing drainage in Sizewell Marsh, permanent loss of SSSI marsh, wet woodland, and fen meadow with un-evidenced expectations for simplistic water level controls as mitigation
  • Dewatering of the platform and changes to surface water runoff conditions will alter the natural hydrological relationship of the complex Sizewell Marsh and Minsmere Levels systems and is likely to impact water quality and have a negative impact on Minsmere Sluice
  • Hydrological impacts of the proposed Causeway and Culvert crossing are not properly assessed
  • The overall ecology of both Sizewell Marsh and Minsmere Levels are reliant on the annual cycle of ground and surface water changes, any disturbance will have direct impacts on bird, insect, reptile and mammal species
  • Some habitat assessments are out of date and, as a result, impacts are likely to be missed or wrongly interpreted
  • No clear plan exists to satisfy the water requirements of the development and impact assessments of water resource options are missing
  • Borrow pits and spoil heaps have great potential for introducing fugitive dust problems and pollution to groundwater and surface water runoff
  • Using the borrow pits as a destination for disposal of unusable materials from excavations, including acidic peat, pose a long-term threat for pollution of groundwater and localized settling over time
  • Significant environmental impact assessments dismissed with undefined monitoring and mitigation
  • Reports relied upon not available for assessment

MLSG endorse the Relevant Representations of,

  • Theberton and Eastbridge Action Group on Sizewell (Stop Sizewell C)
  • Suffolk Coast Action for Resilience
  • Nick Scarr
  • Royal Society for the Protection of Birds
  • Suffolk Wildlife Trust
  • Suffolk Coastal FOE

MLSG believe that the Sizewell C DCO is totally unsuitable for a digital or virtual examination process.
Under Rule 14(3) of The Infrastructure Planning (Examination Procedure) Rules 2010, MLSG may wish to call expert witnesses in support of this representation or subsequent written representations

Minsmere Levels Stakeholder Group

Email us Email Webmaster

This site uses cookies to store information on your computer.

Do you want to allow cookies on this site?

Allow all cookies on this site

Alternatively, you may customise your cookie preferences bellow.
Some parts of this site may be disabled if cookies are blocked.

Allow only local cookies on this site
Block all cookies on this site

'Local cookies' are cookies generated by our site to enable some functionality. Other cookies are those used by external sources such as Google, Facebook or Youtube to enable their features on our website.

For more information about cookies click here.