Skip to content
Accessibility
  • Text Size:
  • Normal
  • Large
  • Larger
  • Screen Colours:
  • Normal
  • Black & Yellow
Minsmere Levels
  • Home
  • Newsletters
  • Sizewell C
    Post Examination submissions Statement of Common Ground and Representations DCO Hearings Consultation Responses Additional Documents Discharge of Requirements
  • MLSG History
    Draining of Minsmere Levels MLSG Meeting Minutes Public Meetings
  • Gallery
    2018 Levels 2013 Tide Surge 2007/2008 Flooding Minsmere and Coast Maps
  • Subscribe To MLSG
  • Donate
  • Useful Links
  • News Posts

Additional Documents

Sizewell C » Additional Documents

The following documents may be useful in understanding the history and some of the technical background of the Sizewell as a potential site for a new nuclear power station and the European Pressurized Reactor.

 

EA Minsmere Flood Risk Management Study Jan 2009 (pdf)
Sizewell C June 2020 Environment, Coastal Morphology and Climate - 2020 perspective (pdf)
Coastguards to Sizewell SMP 2010 (pdf)
2009 Sizewell C Sustainability Assessment (DECC EN-6) (pdf)

Minsmere Levels Stakeholder Group

Email us Email Webmaster

This site uses cookies to store information on your computer.

Do you want to allow cookies on this site?

Allow all cookies on this site

Alternatively, you may customise your cookie preferences bellow.
Some parts of this site may be disabled if cookies are blocked.

Allow only local cookies on this site
Block all cookies on this site

'Local cookies' are cookies generated by our site to enable some functionality. Other cookies are those used by external sources such as Google, Facebook or Youtube to enable their features on our website.

For more information about cookies click here.